ARAB MARINE ACADEMY, KHORFAKKAN, SHARJAH, UAE
RCC Foundation works of 14 buildings, total quantity of steel used was 1500 ton and 3500 cubic metre of concrete
and RCC works of irrigation and water tanks in which the quantity of concrete used was 1500 cubic metre.
Fixing Precast Structures and Easy Panel replacing Traditional Blockwork.
PROJECT DETAILS
Project Cost: AED 2.1 million
Project Client: UNEC , HPBS , Think International.
Project Consultants: QHC
Status: OnGoing