Hume Pipe Culvert Project, Nagpur
Construction of an approach bridge for a Private Client using Hume Pipe Culvert Methodology. Diverted the current Nallah section and excavated the area with continuous dewatering. Layed 3 pipes supported by 4 meter height Headwalls on both side and RCC road with supports on the top for the approach.
PROJECT DETAILS
Project Cost: INR 10 Lakh
Project Client: Private Client
Status: Complete